Renovated Swimming Pool at Sualkuchi

Background:

The swimming pool at Sualkuchi is located near the entrance gate of the Sualkuchi Village and backside of Sualkuchi Bastra Udyan. To execute the renovation and up-gradation work Govt. accorded the Administrative Approval on 2nd January 2023, the work commenced on the ground from 09-05-2023. The size of the pool is 16.60 m x 25.00 M with a depth of 0.90 M to 2.40 M. Total area of the construction is Approx. 4.5 Katha and total construction cost is about Rs. 1.38 Crores.

Some key facilities of the project :

  • Repair, renovation and up-gradation of the pool
  • Construction of the changing room and toilet
  • Ticket room cum office
  • Waiting room
  • Instructor’s waiting lobby
  • Pump and Filter room
  • Pathway upgradation
  • Toilet cum overhead reservoir, etc.